Project: Sportsman   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Kyle Stone   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:1859.9
Start/Last Date:Jul 03, 2019 - Jun 30, 2022
Engine:Lycoming IO-390-EXP
Panel:Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
 
Friendly URL: https://eaabuilderslog.org?s=Sportsman

Home or Last Project Picture

Jul 05, 2020     Step #21 - Complete Rudder cable installation - (3 hours)       Category: Systems (IX)
This went as planned but I was a little perplexed by the NicroPress crimping tool that I borrowed from a local builder. At first, I thought it had the wrong dies in to but after watching a couple of YouTube videos I realized I had the correct crimper. After a few trial runs I ensured everything was aligned correctly and crimps went as planned. All crimps checked out to the go-no-go gauge. Cut the cables with the Dremel then heat shrinked the ends to make it tidy. I did not have to add the extension for the Rudder pedal springs as I was able to connect them without too much effort.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.